Basic Info.
Product Description
Building Formwork Plastic Formwork for Concrete
Product Description Product name | Building Construction Use 58cm Plastic Crawl Space Formwork |
Color | Customized Color |
Product advantages | - STACKABLE: Unmatched logistical advantages when transporting and storing. At a height of 50 cm, conventional filling requires 50 trucks of filling in comparison to only 1 truck of NEW ELEVATOR.
- LIGHTNESS: By far it is the lightest filling solution; the total weight of the cross-section is approximately equal to the thickness of the upper slab.
- HIGH LOAD BEARING: Countless pillars, arches, and domes create the highest load-bearing structure.
- VOID n SPACE: The void space created under NEW ELEVATOR allows an easy installation of electrical as well as mechanical systems. The void space is also perfect to ventilate damp and RADON GAS away from the building.
- FAST: When compared to traditional systems, it guarantees faster installation times up to 80% (in respect to the use of the traditional inert materials).
- SAVINGS: NEW ELEVATOR system allows savings compared to the use of traditional inert materials, especially in terms of transport and installation.
|
Applications | Building Construction |
Product Material | PP/polypropylene |
Our general specifications are 50cm*50cm, height (3, 6, 9, 13, 15, 17, 20, 25, 27, 30, 35, 40, 45, 50, 55, 60, 65, 70) cm, we
Can also be customized according to customer requirements. The role of the TPDVF System 1.
Reduce floor weightIn the traditional method of foundation beam construction, the final stage is the filling step, usually sand or gravel made
of expensive and difficult to store inert materials. Increased the difficulty of on-site management. After using the TPDVF
system, not only is it easy to install, but also it can save a lot of concrete without affecting the load bearing of the floor.
2.Ventilation, moisture-proofThe TPDVF system avoids direct contact between the floor and the ground and solves the problem of moisture resistance
in the house. Inside the TPDVF system, a space is formed, and the outside is connected to the inside through a reasonable
design to avoid the accumulation of radon gas.3.
Effective use of spaceThrough reasonable design, the internal space of the TPDVF system can be used for power lines, telecommunications,
water pipes, etc. The advantage of the TPDVF System 1. Solved the problems of radon and humidity;2.80% /Compared with traditional construction
methods, the installation speed is increased by 80% (compared to traditional concrete pouring);3. Compared with the use of traditional
building materials, the system can save money, especially in transportation and installation;4.TPDVF The height and size of the template in the
TPDVF system can be adjusted as required to suit your design;5.Allows easy installation of pipes and other facilities within the
created void space.Installation of ventilation duct of TPDVF system 1.PREPARATION Creation of a laying surface with lean concrete and installation of the external formwork and the reinforcements of the perimetral beams.2.
FACILITIESInstallation of the pipes to place them into the perimetral ventilation holes and then eventual place of channeling systems for the pipes.3.
Install FormworkInstallation of formwork following the instructions, from right to left as marked in the formwork, without any cutting.4.
Install the closing plateAdjust the position of the formwork and the closed plate (adjust the closed plate ) to be close to the reinforcement cage of the beam.5.
REINFORCEMENTInstall the load distribution reinforcement mesh on the TPDVF formwork and connect it to the foundation beam reinforcement.6.
SINGLE POURPour of the beams and the foundation slabs.Follow the instruction in order to pour correctly.FAQ Are you trading company or manufacturer?
We are manufacturer.
About Sample?
Few samples can be offered per your request.
About Material Color?
We can make the material to your appointed color according to Pantone/RAL#.
How does your factory control the quality?
Quality is the Priority, we always pay great important to quality from beginning to end, we have professional QC for item quality from spare parts to finished goods.
How many days for mass production?
20 days after all artwork and 30% deposit are confirmed.
How can I get the samples? is the sample free?
7-10 days to send free samples by DHL, TNT, UPS
Address:
Room 1101-1105, Building 11, No. 1258, Jinfeng South Road, Mudu Town, Wuzhong District, Suzhou, Jiangsu, China
Business Type:
Trading Company
Business Range:
Chemicals
Management System Certification:
ISO 9001
Company Introduction:
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers. Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.